All documents, Design-Bid-Build

361 documents

307 documents
documentFrom and toStageClauseFormatPrice
Business caseClient and DeveloperEmployer ClientPre-contract: 1. Brief and feasibilityProgramme governance practice PowerPoint and WordAED 199
Options reportClient and DeveloperEmployer ClientPre-contract: 1. Brief and feasibilityProgramme governance practice WordAED 149
Project brief and derogations registerClient and DeveloperEmployer ClientPre-contract: 1. Brief and feasibilityProgramme governance practice Word and ExcelAED 149
Project lifecycle gateway procedureClient and DeveloperEmployer ClientPre-contract: 1. Brief and feasibilityProgramme governance practice Word and ExcelAED 249
Client approval control formClient and DeveloperEmployer ClientPre-contract: 1. Brief and feasibility, 2. Design, 3. Tender and award; Post-contract: 5. Handover and defectsProgramme governance practice WordAED 49
High-level programme and milestone chartClient and DeveloperEmployer ClientPre-contract: 1. Brief and feasibilityProgramme governance practice ExcelAED 79
Gateway presentation set (gates A to F)Client and DeveloperEmployer ClientPre-contract: 1. Brief and feasibility, 2. Design, 3. Tender and awardProgramme governance practice PowerPointAED 249
Monthly programme report to the clientClient and DeveloperEmployer ClientPost-contract: 4. ConstructionProgramme governance practice Word and ExcelAED 149
Programme change log and client change requestClient and DeveloperEmployer ClientPost-contract: 4. ConstructionProgramme governance practice ExcelAED 99
Budget and next-stage funding approval requestClient and DeveloperEmployer ClientPre-contract: 2. Design, 3. Tender and awardProgramme governance practice Word and ExcelAED 79
Asset transfer formClient and DeveloperEmployer ClientPost-contract: 5. Handover and defectsProgramme governance practice WordAED 49
Close-out and lessons learned reportClient and DeveloperEmployer ClientPost-contract: 5. Handover and defectsProgramme governance practice WordAED 99
Go-live plan and operational readiness checklistClient and DeveloperEmployer ClientPost-contract: 6. OperationProgramme governance practice ExcelAED 79
Consultant prequalification questionnaire and scoringEmployer and Design ConsultantEmployer Design ConsultantPre-contract: 1. Request for proposalUAE practice Word and ExcelAED 99
Expression of interest letterEmployer and Design ConsultantEmployer Design ConsultantPre-contract: 1. Request for proposalUAE practice WordAED 39
Mutual non-disclosure agreementEmployer and Design ConsultantEmployer Design ConsultantPre-contract: 1. Request for proposalUAE practice WordAED 149
Request for proposal for consultancy servicesEmployer and Design ConsultantEmployer Design ConsultantPre-contract: 1. Request for proposalFIDIC White Book 2017 Word and ExcelAED 199
Technical proposal templateEmployer and Design ConsultantDesign Consultant EmployerPre-contract: 2. Proposal and awardUAE practice WordAED 149
Fee proposal and staffing scheduleEmployer and Design ConsultantDesign Consultant EmployerPre-contract: 2. Proposal and awardUAE practice ExcelAED 99
Technical evaluation sheet and report (consultants)Employer and Design ConsultantEmployer EmployerPre-contract: 2. Proposal and awardUAE practice Word and ExcelAED 129
Fee evaluation and normalisation sheetEmployer and Design ConsultantEmployer EmployerPre-contract: 2. Proposal and awardUAE practice ExcelAED 99
Combined evaluation report and award recommendationEmployer and Design ConsultantEmployer EmployerPre-contract: 2. Proposal and awardUAE practice Word and ExcelAED 149
Letter of intentEmployer and Design ConsultantEmployer Design ConsultantPre-contract: 2. Proposal and awardUAE practice WordAED 49
Letter of awardEmployer and Design ConsultantEmployer Design ConsultantPre-contract: 2. Proposal and awardUAE practice WordAED 79
Regret letter to unsuccessful biddersEmployer and Design ConsultantEmployer Design ConsultantPre-contract: 2. Proposal and awardUAE practice WordAED 39
Consultancy services agreement, designEmployer and Design ConsultantEmployer Design ConsultantPost-contract: 3. Agreement and startFIDIC White Book 2017 WordAED 449
Consultancy services agreement, supervision (the Engineer)Employer and Supervision ConsultantEmployer Supervision ConsultantPost-contract: 3. Agreement and mobilisationFIDIC White Book 2017 WordAED 449
Professional indemnity confirmation and registerEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 3. Agreement and startFIDIC White Book 2017 Word and ExcelAED 49
Notice to commence servicesEmployer and Design ConsultantEmployer Design ConsultantPost-contract: 3. Agreement and startFIDIC White Book 2017 WordAED 39
Kick-off meeting agenda and minutesEmployer and Design ConsultantEmployer Design ConsultantPost-contract: 3. Agreement and startUAE practice WordAED 39
Design deliverables register and programmeEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 3. Agreement and startFIDIC White Book 2017 ExcelAED 99
Communication and document numbering protocolEmployer and Design ConsultantEmployer Design ConsultantPost-contract: 3. Agreement and startUAE practice WordAED 79
BIM execution planEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 3. Agreement and startUAE practice Word and ExcelAED 199
Design review comment sheet (A, B, C status)Employer and Design ConsultantEmployer Design ConsultantPost-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvals, 7. Tender packageUAE practice ExcelAED 79
Design review response sheetEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvalsUAE practice ExcelAED 59
Stage approval and instruction to proceedEmployer and Design ConsultantEmployer Design ConsultantPost-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvals, 7. Tender packageFIDIC White Book 2017 WordAED 39
Design risk registerEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 5. Schematic design, 6. Detailed design and approvalsUAE practice ExcelAED 79
Authority submissions and NOC trackerEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 5. Schematic design, 6. Detailed design and approvalsUAE practice ExcelAED 99
NOC request letter setEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 6. Detailed design and approvalsUAE practice WordAED 79
Building permit application tracker and checklistEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 6. Detailed design and approvalsUAE practice ExcelAED 79
Cost plan to NRM 1: order of cost estimate and elemental cost planEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvalsRICS NRM 1 ExcelAED 149
Design consultant monthly progress reportEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvals, 7. Tender packageFIDIC White Book 2017 WordAED 99
IFC package compliance certificate and transmittalEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 9. Tender support and close-outUAE practice WordAED 49
Tender query response set and transmittal for approvalEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 9. Tender support and close-outUAE practice Word and ExcelAED 59
Engineer’s monthly supervision reportEmployer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 4. Construction supervisionFIDIC White Book 2017 WordAED 129
Supervision site diary and staff attendanceEmployer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 4. Construction supervisionFIDIC White Book 2017 ExcelAED 59
Transmittal with status codesEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorUAE practice Word and ExcelAED 39
Design change requestEmployer and Design ConsultantEmployer Design ConsultantPost-contract: 8. Fees and changesFIDIC White Book 2017 WordAED 49
Additional services proposal (fee and time)Employer and Design ConsultantDesign Consultant EmployerPost-contract: 8. Fees and changesFIDIC White Book 2017 Word and ExcelAED 99
Variation to the consultancy agreementEmployer and Design ConsultantEmployer Design ConsultantPost-contract: 8. Fees and changesFIDIC White Book 2017 WordAED 99
Claim for extended supervision feesEmployer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 5. Changes, claims and feesFIDIC White Book 2017 Word and ExcelAED 199
Fee invoice with deliverables statementEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 8. Fees and changesFIDIC White Book 2017 Word and ExcelAED 59
Fee certificate and payment approvalEmployer and Design ConsultantEmployer Design ConsultantPost-contract: 8. Fees and changesFIDIC White Book 2017 ExcelAED 59
Fee payment trackerEmployer and Design ConsultantEmployer EmployerPost-contract: 8. Fees and changesUAE practice ExcelAED 79
Design close-out report and as-built design handoverEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 9. Tender support and close-outFIDIC White Book 2017 WordAED 99
Consultant performance evaluationEmployer and Design ConsultantEmployer EmployerPost-contract: 9. Tender support and close-outUAE practice ExcelAED 49
Request for release of securityEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 9. Tender support and close-outUAE practice WordAED 39
RFP to subconsultant with scope split and interface matrixDesign Consultant and SubconsultantDesign Consultant SubconsultantPre-contract: 1. Request for proposalFIDIC Sub-Consultancy Agreement Word and ExcelAED 129
Sub-consultancy agreementDesign Consultant and SubconsultantDesign Consultant SubconsultantPost-contract: 3. Agreement and startFIDIC Sub-Consultancy Agreement WordAED 299
Design coordination protocol and clash logDesign Consultant and SubconsultantDesign Consultant SubconsultantPost-contract: 3. Agreement and startUAE practice Word and ExcelAED 79
Subconsultant deliverables scheduleDesign Consultant and SubconsultantSubconsultant Design ConsultantPost-contract: 3. Agreement and startFIDIC Sub-Consultancy Agreement ExcelAED 59
Coordination meeting minutesDesign Consultant and SubconsultantDesign Consultant SubconsultantPost-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvalsUAE practice WordAED 39
Additional services request (subconsultant)Design Consultant and SubconsultantSubconsultant Design ConsultantPost-contract: 8. Fees and changesFIDIC Sub-Consultancy Agreement WordAED 59
Variation to the sub-consultancy agreementDesign Consultant and SubconsultantDesign Consultant SubconsultantPost-contract: 8. Fees and changesFIDIC Sub-Consultancy Agreement WordAED 79
Subconsultant fee certification (payment when paid)Design Consultant and SubconsultantDesign Consultant SubconsultantPost-contract: 8. Fees and changesFIDIC Sub-Consultancy Agreement ExcelAED 59
Contractor prequalification questionnaire and scoringEmployer and Main ContractorEmployer Main ContractorPre-contract: 1. TenderUAE practice Word and ExcelAED 99
Invitation to tender and instructions to tenderersEmployer and Main ContractorEmployer Main ContractorPre-contract: 1. TenderFIDIC 1999 Red Book WordAED 249
Particular conditions and contract data scheduleEmployer and Main ContractorEmployer Main ContractorPre-contract: 1. TenderRB 1.1 WordAED 199
Pricing schedule and bill of quantities preambleEmployer and Main ContractorEmployer Main ContractorPre-contract: 1. TenderRB 12 ExcelAED 149
Tender bond wording and registerEmployer and Main ContractorMain Contractor EmployerPre-contract: 1. TenderUAE practice Word and ExcelAED 59
Tender submission packEmployer and Main ContractorMain Contractor EmployerPre-contract: 1. TenderFIDIC 1999 Red Book Word and ExcelAED 249
Tender query formEmployer and Main ContractorMain Contractor EmployerPre-contract: 1. TenderUAE practice WordAED 39
Tender query log and addendumEmployer and Main ContractorEmployer Main ContractorPre-contract: 1. TenderUAE practice Word and ExcelAED 79
Tender opening reportEmployer and Main ContractorEmployer EmployerPre-contract: 2. Evaluation and awardUAE practice WordAED 49
Technical evaluation report (contractors)Employer and Main ContractorEmployer EmployerPre-contract: 2. Evaluation and awardUAE practice Word and ExcelAED 129
Commercial evaluation and comparative statementEmployer and Main ContractorEmployer EmployerPre-contract: 2. Evaluation and awardUAE practice ExcelAED 149
Post-tender clarification letterEmployer and Main ContractorEmployer Main ContractorPre-contract: 2. Evaluation and awardUAE practice WordAED 49
Post-tender clarification responseEmployer and Main ContractorMain Contractor EmployerPre-contract: 2. Evaluation and awardUAE practice WordAED 39
Best and final offer requestEmployer and Main ContractorEmployer Main ContractorPre-contract: 2. Evaluation and awardUAE practice WordAED 39
Negotiation minutes and agreed points recordEmployer and Main ContractorEmployer Main ContractorPre-contract: 2. Evaluation and awardUAE practice WordAED 49
Contract agreement and contract documents compilationEmployer and Main ContractorEmployer Main ContractorPost-contract: 3. Sign and startRB 1.5 WordAED 199
Performance security wording and registerEmployer and Main ContractorMain Contractor EmployerPost-contract: 3. Sign and startRB 4.2 Word and ExcelAED 79
Advance payment guarantee wordingEmployer and Main ContractorMain Contractor EmployerPost-contract: 3. Sign and startRB 14.2 WordAED 59
Parent company guarantee wordingEmployer and Main ContractorMain Contractor EmployerPost-contract: 3. Sign and startUAE practice WordAED 99
Insurance certificates register and compliance checkEmployer and Main ContractorEmployer EmployerPost-contract: 3. Sign and startRB 18 ExcelAED 79
Insurance claim notificationEmployer and Main ContractorMain Contractor EmployerPost-contract: 4. Build and monitorRB 18.1 WordAED 49
Bond and guarantee register with expiry trackerEmployer and Main ContractorEmployer EmployerPost-contract: 3. Sign and startUAE practice ExcelAED 79
Commencement noticeEngineer and Main ContractorEngineer Main ContractorPost-contract: 3. Sign and startRB 8.1 WordAED 39
Baseline programme submissionEngineer and Main ContractorMain Contractor EngineerPost-contract: 3. Sign and startRB 8.3 Word and ExcelAED 129
Programme review commentsEngineer and Main ContractorEngineer Main ContractorPost-contract: 3. Sign and startRB 8.3 WordAED 49
Mobilisation plan and checklistEmployer and Main ContractorMain Contractor EmployerPost-contract: 3. Sign and startUAE practice ExcelAED 59
Key staff approval requestEngineer and Main ContractorMain Contractor EngineerPost-contract: 3. Sign and startRB 4.3 WordAED 39
Subcontractor and supplier approval requestEngineer and Main ContractorMain Contractor EngineerPost-contract: 3. Sign and startRB 4.4 WordAED 49
Engineer’s consent to subcontractor or supplierEngineer and Main ContractorEngineer Main ContractorPost-contract: 3. Sign and startRB 4.4 WordAED 39
Site handover and possession recordEmployer and Main ContractorEmployer Main ContractorPost-contract: 3. Sign and startRB 2.1 WordAED 49
Contractor’s objection to a nominationEmployer and Main ContractorMain Contractor EmployerPost-contract: 3. Sign and startRB 5.2 WordAED 39
Free-issue materials issue and acceptance recordEmployer and Main ContractorEmployer Main ContractorPost-contract: 4. Build and monitorRB 4.20 ExcelAED 59
Request for information form and registerEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 1.9 ExcelAED 79
Material approval request and submittal registerEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 7.2 ExcelAED 79
Shop drawing submittal and drawing logEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 4.1 ExcelAED 79
Method statement submittalEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 8.3 WordAED 79
Risk assessment and method statement (RAMS)Engineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorUAE practice WordAED 99
Submittal review sheet with status codeEngineer and Main ContractorEngineer Main ContractorPost-contract: 4. Build and monitorRB 7.2 WordAED 49
Inspection request and logEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 7.3 ExcelAED 79
Material inspection request on deliveryEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 7.3 ExcelAED 49
Inspection and test planEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 7.4 ExcelAED 99
Non-conformance report and logEngineer and Main ContractorEngineer Main ContractorPost-contract: 4. Build and monitorRB 7.5 ExcelAED 79
Engineer’s instruction and registerEngineer and Main ContractorEngineer Main ContractorPost-contract: 4. Build and monitorRB 3.3 Word and ExcelAED 59
Site observation reportEngineer and Main ContractorEngineer Main ContractorPost-contract: 4. Build and monitorRB 7.3 WordAED 39
Daily site reportEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 6.10 ExcelAED 49
Weekly progress reportEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorUAE practice Word and ExcelAED 79
Monthly progress reportEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 4.21 WordAED 149
Programme update and look-aheadEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 8.3 ExcelAED 79
Cash flow estimateEngineer and Main ContractorMain Contractor EngineerPost-contract: 3. Sign and startRB 14.4 ExcelAED 79
HSE monthly statistics and incident notificationEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 6.7 Word and ExcelAED 79
Permit to work setMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 4. Build and monitorUAE practice WordAED 79
Progress meeting minutes and action trackerEngineer and Main ContractorEngineer Main ContractorPost-contract: 4. Build and monitorUAE practice Word and ExcelAED 39
Correspondence and notices registerEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 1.3 ExcelAED 59
Early warning noticeEngineer and Main ContractorMain Contractor EngineerPost-contract: 4. Build and monitorRB 8.3 WordAED 39
Notice to correctEngineer and Main ContractorEngineer Main ContractorPost-contract: 4. Build and monitorRB 15.1 WordAED 49
Civil Defence inspection and completion certificate checklistEngineer and Main ContractorMain Contractor EngineerPost-contract: 7. Handover and closeUAE practice Word and ExcelAED 79
Permanent utility connection request setEngineer and Main ContractorMain Contractor EngineerPost-contract: 7. Handover and closeUAE practice WordAED 59
Notice of variation and request for instructionEngineer and Main ContractorMain Contractor EngineerPost-contract: 5. Changes and claimsRB 13.1 WordAED 49
Engineer’s request for variation proposalEngineer and Main ContractorEngineer Main ContractorPost-contract: 5. Changes and claimsRB 13.3 WordAED 39
Variation proposal with cost and time breakdownEngineer and Main ContractorMain Contractor EngineerPost-contract: 5. Changes and claimsRB 13.3 Word and ExcelAED 99
Variation register with estimates and approved valuesEngineer and Main ContractorEngineer EngineerPost-contract: 5. Changes and claimsRB 13 ExcelAED 149
Engineer’s recommendation to the Employer (variation)Employer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 5. Changes, claims and feesRB 13.3 WordAED 79
Variation approval formEmployer and Main ContractorEmployer EmployerPost-contract: 5. Changes and claimsUAE practice WordAED 49
Variation orderEngineer and Main ContractorEngineer Main ContractorPost-contract: 5. Changes and claimsRB 13.3 WordAED 79
Notice of claimEngineer and Main ContractorMain Contractor EngineerPost-contract: 5. Changes and claimsRB 20.1 WordAED 59
Engineer’s response to notice and request for particularsEngineer and Main ContractorEngineer Main ContractorPost-contract: 5. Changes and claimsRB 20.1 WordAED 49
Contemporary records pack and delay event logEngineer and Main ContractorMain Contractor EngineerPost-contract: 5. Changes and claimsRB 20.1 ExcelAED 99
Fully detailed extension of time and prolongation claimEngineer and Main ContractorMain Contractor EngineerPost-contract: 5. Changes and claimsRB 20.1 Word and ExcelAED 249
Recovery programme and mitigation noticeEngineer and Main ContractorMain Contractor EngineerPost-contract: 5. Changes and claimsRB 8.6 Word and ExcelAED 99
Engineer’s determinationEngineer and Main ContractorEngineer Main ContractorPost-contract: 5. Changes and claimsRB 3.5 WordAED 79
Engineer’s recommendation to the Employer (time and cost)Employer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 5. Changes, claims and feesRB 8.4 WordAED 79
Extension of time approval and award letterEmployer and Main ContractorEmployer Main ContractorPost-contract: 5. Changes and claimsRB 8.4 WordAED 59
Employer’s claim noticeEngineer and Main ContractorEngineer Main ContractorPost-contract: 5. Changes and claimsRB 2.5 WordAED 59
Delay damages notice and calculationEmployer and Main ContractorEmployer Main ContractorPost-contract: 5. Changes and claimsRB 8.7 Word and ExcelAED 79
Suspension and termination notice setEmployer and Main ContractorEmployer Main ContractorPost-contract: 5. Changes and claimsRB 15 WordAED 149
Advance payment applicationEngineer and Main ContractorMain Contractor EngineerPost-contract: 6. PaymentsRB 14.2 Word and ExcelAED 59
Interim payment application with statement and schedulesEngineer and Main ContractorMain Contractor EngineerPost-contract: 6. PaymentsRB 14.3 ExcelAED 149
Interim payment certificateEngineer and Main ContractorEngineer Main ContractorPost-contract: 6. PaymentsRB 14.6 ExcelAED 99
Payment certificate approval and payment adviceEmployer and Main ContractorEmployer EmployerPost-contract: 6. PaymentsRB 14.7 Word and ExcelAED 49
Tax invoice format matched to the certificateEmployer and Main ContractorMain Contractor EmployerPost-contract: 6. PaymentsUAE VAT law ExcelAED 39
Measurement and dayworks sheetsEngineer and Main ContractorMain Contractor EngineerPost-contract: 6. PaymentsRB 12.1 ExcelAED 79
Provisional sum and prime cost expenditure statementEngineer and Main ContractorMain Contractor EngineerPost-contract: 6. PaymentsRB 13.5 ExcelAED 59
Retention tracker and release requestEmployer and Main ContractorMain Contractor EmployerPost-contract: 6. PaymentsRB 14.9 ExcelAED 99
Retention bond wordingEmployer and Main ContractorMain Contractor EmployerPost-contract: 6. PaymentsRB 14.9 WordAED 59
Project cost reportEmployer and Main ContractorEmployer EmployerPost-contract: 6. PaymentsUAE practice ExcelAED 149
Statement at completionEngineer and Main ContractorMain Contractor EngineerPost-contract: 6. PaymentsRB 14.10 ExcelAED 99
Final statement and dischargeEngineer and Main ContractorMain Contractor EngineerPost-contract: 6. PaymentsRB 14.11 Word and ExcelAED 149
Final payment certificateEngineer and Main ContractorEngineer Main ContractorPost-contract: 6. PaymentsRB 14.13 ExcelAED 79
Handover strategy and documentation planEngineer and Main ContractorMain Contractor EngineerPost-contract: 7. Handover and closeRB 4.1 WordAED 99
Testing and commissioning method statement and reportEngineer and Main ContractorMain Contractor EngineerPost-contract: 7. Handover and closeRB 9.1 Word and ExcelAED 129
Handover documents indexEngineer and Main ContractorMain Contractor EngineerPost-contract: 7. Handover and closeRB 4.1 ExcelAED 79
O&M manual structure and as-built indexEngineer and Main ContractorMain Contractor EngineerPost-contract: 7. Handover and closeUAE practice WordAED 99
Request for taking-over certificateEngineer and Main ContractorMain Contractor EngineerPost-contract: 7. Handover and closeRB 10.1 WordAED 49
Snag list and joint inspection recordEngineer and Main ContractorEngineer Main ContractorPost-contract: 7. Handover and closeRB 10.1 ExcelAED 59
Engineer’s recommendation for taking overEmployer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 6. Handover and close-outRB 10.1 WordAED 49
Taking-over certificateEngineer and Main ContractorEngineer Main ContractorPost-contract: 7. Handover and closeRB 10.1 WordAED 59
Post-taking-over site rules and access protocolEmployer and Main ContractorEmployer Main ContractorPost-contract: 7. Handover and closeUAE practice WordAED 49
Defect notification and logEngineer and Main ContractorEngineer Main ContractorPost-contract: 7. Handover and closeRB 11.1 Word and ExcelAED 59
Defects liability trackerEmployer and Main ContractorEmployer EmployerPost-contract: 7. Handover and closeRB 11 ExcelAED 79
Notice extending the defects notification periodEngineer and Main ContractorEngineer Main ContractorPost-contract: 7. Handover and closeRB 11.3 WordAED 39
Recommendation to remedy by others and cost recovery noticeEngineer and Main ContractorEngineer Main ContractorPost-contract: 7. Handover and closeRB 11.4 WordAED 59
Request for performance certificateEngineer and Main ContractorMain Contractor EngineerPost-contract: 7. Handover and closeRB 11.9 WordAED 39
Performance certificateEngineer and Main ContractorEngineer Main ContractorPost-contract: 7. Handover and closeRB 11.9 WordAED 59
Final account statement and agreementEmployer and Main ContractorMain Contractor EmployerPost-contract: 7. Handover and closeRB 14.11 ExcelAED 199
Contractor performance evaluationEmployer and Main ContractorEmployer EmployerPost-contract: 7. Handover and closeUAE practice ExcelAED 49
Vendor suspension and blacklist formEmployer and Main ContractorEmployer EmployerPost-contract: 7. Handover and closeUAE practice WordAED 39
Subcontract package creation checklist and workshop recordMain Contractor and SubcontractorMain Contractor Main ContractorPre-contract: 1. TenderUAE practice Word and ExcelAED 79
Subcontractor prequalification questionnaire and scoringMain Contractor and SubcontractorMain Contractor SubcontractorPre-contract: 1. TenderUAE practice Word and ExcelAED 79
Subcontract invitation to tender packMain Contractor and SubcontractorMain Contractor SubcontractorPre-contract: 1. TenderFIDIC Conditions of Subcontract 2011 Word and ExcelAED 149
Subcontractor quotation and compliance statementMain Contractor and SubcontractorSubcontractor Main ContractorPre-contract: 1. TenderFIDIC Conditions of Subcontract 2011 Word and ExcelAED 79
Technical and contractual compliance sheetsMain Contractor and SubcontractorMain Contractor Main ContractorPre-contract: 2. Evaluation and awardUAE practice ExcelAED 79
Non-standard payment terms approval formMain Contractor and SubcontractorMain Contractor Main ContractorPre-contract: 2. Evaluation and awardUAE practice WordAED 39
Budget allocation, transfer and uplift request formsMain Contractor and SubcontractorMain Contractor Main ContractorPre-contract: 2. Evaluation and awardUAE practice Word and ExcelAED 79
Tender evaluation report with recommendation (subcontract)Main Contractor and SubcontractorMain Contractor Main ContractorPre-contract: 2. Evaluation and awardUAE practice Word and ExcelAED 99
Purchase request formMain Contractor and SubcontractorMain Contractor Main ContractorPre-contract: 1. TenderUAE practice ExcelAED 39
Subcontract agreement, supply and installationMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 3. Sign and startFIDIC Conditions of Subcontract 2011 WordAED 399
Subcontract agreement, installation onlyMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 3. Sign and startFIDIC Conditions of Subcontract 2011 WordAED 349
Subcontract agreement, design, supply and installationMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 3. Sign and startFIDIC Conditions of Subcontract 2011 WordAED 449
Site rules, attendances and contra-charge scheduleMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 3. Sign and startFIDIC Conditions of Subcontract 2011 Word and ExcelAED 59
Manpower return and daily attendanceMain Contractor and SubcontractorSubcontractor Main ContractorPost-contract: 4. Build and monitorFIDIC Conditions of Subcontract 2011 ExcelAED 39
Safety violation noticeMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 4. Build and monitorUAE practice WordAED 39
Site instruction to subcontractorMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 4. Build and monitorFIDIC Conditions of Subcontract 2011 WordAED 39
Subcontract variation requestMain Contractor and SubcontractorSubcontractor Main ContractorPost-contract: 5. Changes and claimsSC 13 WordAED 49
Subcontract variation orderMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 5. Changes and claimsSC 13 WordAED 59
Subcontractor notice of delay and claimMain Contractor and SubcontractorSubcontractor Main ContractorPost-contract: 5. Changes and claimsSC 20.2 WordAED 59
Subcontract extension of time grant or rejectionMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 5. Changes and claimsSC 8.4 WordAED 49
Back-charge notice and contra-charge statementMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 5. Changes and claimsFIDIC Conditions of Subcontract 2011 Word and ExcelAED 79
Response to back-chargeMain Contractor and SubcontractorSubcontractor Main ContractorPost-contract: 5. Changes and claimsFIDIC Conditions of Subcontract 2011 WordAED 39
Subcontractor monthly payment applicationMain Contractor and SubcontractorSubcontractor Main ContractorPost-contract: 6. PaymentsSC 14.3 ExcelAED 99
Subcontract payment assessment and certificateMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 6. PaymentsSC 14.6 ExcelAED 99
Subcontract completion notice and handoverMain Contractor and SubcontractorSubcontractor Main ContractorPost-contract: 7. Handover and closeSC 10 WordAED 49
Taking-over of subcontract worksMain Contractor and SubcontractorMain Contractor SubcontractorPost-contract: 7. Handover and closeSC 10 WordAED 39
Nomination instruction and letterEmployer and Nominated SubcontractorEmployer Nominated SubcontractorPre-contract: 2. Evaluation and awardRB 5.1 WordAED 59
Nominated subcontract: Employer-required terms scheduleEmployer and Nominated SubcontractorEmployer Nominated SubcontractorPost-contract: 3. Sign and startRB 5.2 WordAED 149
Attendances and profit schedule for nominated worksEmployer and Nominated SubcontractorEmployer Nominated SubcontractorPost-contract: 3. Sign and startRB 13.5 ExcelAED 59
Direct payment certificate to nominated subcontractorEmployer and Nominated SubcontractorEmployer Nominated SubcontractorPost-contract: 6. PaymentsRB 5.4 Word and ExcelAED 59
Collateral warranty to the EmployerEmployer and Nominated SubcontractorNominated Subcontractor EmployerPost-contract: 7. Handover and closeUAE practice WordAED 199
Material requisition (site)Main Contractor and SupplierMain Contractor Main ContractorPre-contract: 1. TenderUAE practice ExcelAED 39
Request for quotation packMain Contractor and SupplierMain Contractor SupplierPre-contract: 1. TenderUAE practice Word and ExcelAED 59
Vendor registration form and approved vendor listMain Contractor and SupplierSupplier Main ContractorPre-contract: 1. TenderUAE practice Word and ExcelAED 59
Supplier quotation with compliance statementMain Contractor and SupplierSupplier Main ContractorPre-contract: 1. TenderUAE practice Word and ExcelAED 59
Technical compliance sheet (specification against offer)Main Contractor and SupplierSupplier Main ContractorPre-contract: 1. TenderUAE practice ExcelAED 59
Quotation comparison sheetMain Contractor and SupplierMain Contractor Main ContractorPre-contract: 2. Evaluation and awardUAE practice ExcelAED 79
Negotiation record and discount confirmation letterEmployer and Specialist VendorSupplier EmployerPre-contract: 2. Evaluation and awardUAE practice WordAED 39
Single-source justification formEmployer and Specialist VendorEmployer EmployerPre-contract: 2. Evaluation and awardUAE practice WordAED 49
Purchase order with terms and conditionsMain Contractor and SupplierMain Contractor SupplierPost-contract: 3. Sign and startUAE practice Word and ExcelAED 99
Supply agreement (supply only)Main Contractor and SupplierMain Contractor SupplierPost-contract: 3. Sign and startUAE practice WordAED 249
Plant and equipment hire agreement with rate scheduleMain Contractor and SupplierMain Contractor SupplierPost-contract: 3. Sign and startUAE practice Word and ExcelAED 199
Order acknowledgement and delivery scheduleMain Contractor and SupplierSupplier Main ContractorPost-contract: 3. Sign and startUAE practice Word and ExcelAED 39
Delivery note and packing listMain Contractor and SupplierSupplier Main ContractorPost-contract: 4. Build and monitorUAE practice ExcelAED 39
Goods received note and discrepancy logMain Contractor and SupplierMain Contractor SupplierPost-contract: 4. Build and monitorUAE practice ExcelAED 39
Rejection and return noteMain Contractor and SupplierMain Contractor SupplierPost-contract: 4. Build and monitorUAE practice WordAED 39
Expediting logMain Contractor and SupplierMain Contractor Main ContractorPost-contract: 4. Build and monitorUAE practice ExcelAED 59
Factory and site acceptance test protocolMain Contractor and SupplierSupplier Main ContractorPost-contract: 4. Build and monitorRB 7.4 Word and ExcelAED 129
Test certificates and certificate of origin checklistMain Contractor and SupplierSupplier Main ContractorPost-contract: 4. Build and monitorUAE practice ExcelAED 39
Order amendmentMain Contractor and SupplierMain Contractor SupplierPost-contract: 5. Changes and claimsUAE practice WordAED 39
Statement of accountMain Contractor and SupplierSupplier Main ContractorPost-contract: 6. PaymentsUAE practice ExcelAED 39
Warranty certificate and spare parts listMain Contractor and SupplierSupplier Main ContractorPost-contract: 7. Handover and closeUAE practice WordAED 59
Training and handover of operation recordEmployer and Specialist VendorSupplier EmployerPost-contract: 7. Handover and closeUAE practice WordAED 39
Supplier performance scorecardMain Contractor and SupplierMain Contractor Main ContractorPost-contract: 7. Handover and closeUAE practice ExcelAED 49
Warranty claim noticeMain Contractor and SupplierMain Contractor SupplierPost-contract: 8. OperateUAE practice WordAED 39
International purchase order with termsEmployer and Specialist VendorEmployer SupplierPost-contract: 3. Sign and startUAE practice WordAED 149
Letter of credit and advance payment guarantee instructionEmployer and Specialist VendorEmployer EmployerPost-contract: 3. Sign and startUAE practice WordAED 79
Export and import licence checklistEmployer and Specialist VendorSupplier EmployerPost-contract: 3. Sign and startUAE practice ExcelAED 49
Shipping documents checklistEmployer and Specialist VendorSupplier EmployerPost-contract: 4. Build and monitorUAE practice ExcelAED 49
Customs clearance and delivery acceptance recordEmployer and Specialist VendorEmployer EmployerPost-contract: 4. Build and monitorUAE practice ExcelAED 49
Interface matrix: vendor supply against contractor installationEmployer and Specialist VendorEmployer SupplierPost-contract: 3. Sign and startUAE practice ExcelAED 99
Installation supervision and commissioning report (vendor)Employer and Specialist VendorSupplier EmployerPost-contract: 7. Handover and closeUAE practice WordAED 79
Vendor payment milestone trackerEmployer and Specialist VendorEmployer EmployerPost-contract: 6. PaymentsUAE practice ExcelAED 59
Labour-only subcontract agreementSubcontractor and SuppliersSubcontractor SupplierPost-contract: 3. Sign and startUAE practice WordAED 199
Piece-rate agreement and measurement sheetSubcontractor and SuppliersSubcontractor SupplierPost-contract: 3. Sign and startUAE practice Word and ExcelAED 79
Daily attendance sheetSubcontractor and SuppliersSubcontractor SupplierPost-contract: 4. Build and monitorUAE practice ExcelAED 29
Payment record and receiptSubcontractor and SuppliersSubcontractor SupplierPost-contract: 6. PaymentsUAE practice ExcelAED 29
RFP for facilities management servicesEmployer and FM ProviderEmployer FM ProviderPre-contract: 1. TenderUAE practice Word and ExcelAED 199
Facilities management agreement with SLA and KPIsEmployer and FM ProviderEmployer FM ProviderPost-contract: 3. Sign and startUAE practice WordAED 349
Asset register handoverEmployer and FM ProviderEmployer FM ProviderPost-contract: 3. Sign and startUAE practice ExcelAED 99
Warranties and guarantees registerEmployer and FM ProviderEmployer FM ProviderPost-contract: 8. OperateUAE practice ExcelAED 59
Planned preventive maintenance scheduleEmployer and FM ProviderFM Provider EmployerPost-contract: 8. OperateUAE practice ExcelAED 149
Work order and job cardEmployer and FM ProviderFM Provider EmployerPost-contract: 8. OperateUAE practice ExcelAED 49
Reactive call log with SLA trackerEmployer and FM ProviderFM Provider EmployerPost-contract: 8. OperateUAE practice ExcelAED 99
Monthly FM performance reportEmployer and FM ProviderFM Provider EmployerPost-contract: 8. OperateUAE practice Word and ExcelAED 149
SLA and KPI review and deduction sheetEmployer and FM ProviderEmployer FM ProviderPost-contract: 6. PaymentsUAE practice ExcelAED 79
Condition survey templateEmployer and FM ProviderFM Provider EmployerPost-contract: 8. OperateUAE practice Word and ExcelAED 99
Maintenance subcontract agreementFM Provider and Maintenance SubcontractorsFM Provider Maintenance SubcontractorPost-contract: 3. Sign and startUAE practice WordAED 299
Maintenance package RFQ and scope splitFM Provider and Maintenance SubcontractorsFM Provider Maintenance SubcontractorPre-contract: 1. TenderUAE practice Word and ExcelAED 79
Maintenance subcontractor offer and compliance statementFM Provider and Maintenance SubcontractorsMaintenance Subcontractor FM ProviderPre-contract: 1. TenderUAE practice Word and ExcelAED 59
Call-out instruction and job closure flow-downFM Provider and Maintenance SubcontractorsFM Provider Maintenance SubcontractorPost-contract: 4. Build and monitorUAE practice ExcelAED 49
PPM completion return and service sheetFM Provider and Maintenance SubcontractorsMaintenance Subcontractor FM ProviderPost-contract: 4. Build and monitorUAE practice ExcelAED 39
Maintenance subcontractor invoice certificationFM Provider and Maintenance SubcontractorsFM Provider Maintenance SubcontractorPost-contract: 6. PaymentsUAE practice ExcelAED 49
Spares and consumables purchase orderFM Provider and Maintenance SubcontractorsFM Provider Maintenance SubcontractorPost-contract: 3. Sign and startUAE practice Word and ExcelAED 59
Maintenance subcontractor performance reviewFM Provider and Maintenance SubcontractorsFM Provider FM ProviderPost-contract: 7. Handover and closeUAE practice ExcelAED 49
Subcontract tender proposal (technical and commercial)Main Contractor and SubcontractorSubcontractor Main ContractorPre-contract: 1. TenderFIDIC Conditions of Subcontract 2011 Word and ExcelAED 149
Supplier offer packMain Contractor and SupplierSupplier Main ContractorPre-contract: 1. TenderUAE practice Word and ExcelAED 99
Defect report to the Employer during the defects periodEmployer and FM ProviderFM Provider EmployerPost-contract: 7. Handover and closeRB 11.1 Word and ExcelAED 49
Warranty claim request to the EmployerEmployer and FM ProviderFM Provider EmployerPost-contract: 8. OperateUAE practice WordAED 39
Development mandate and delegated authority letterClient and DeveloperClient EmployerPre-contract: 1. Brief and feasibilityProgramme governance practice WordAED 99
Gateway decision noticeClient and DeveloperClient EmployerPre-contract: 1. Brief and feasibility, 2. Design, 3. Tender and award; Post-contract: 5. Handover and defectsProgramme governance practice WordAED 59
Client review comments on stage reportClient and DeveloperClient EmployerPre-contract: 1. Brief and feasibility, 2. DesignProgramme governance practice ExcelAED 49
Funding release confirmationClient and DeveloperClient EmployerPre-contract: 2. Design, 3. Tender and awardProgramme governance practice WordAED 59
Client change instructionClient and DeveloperClient EmployerPre-contract: 2. Design; Post-contract: 4. ConstructionProgramme governance practice WordAED 59
Scope of design servicesEmployer and Design ConsultantEmployer Design ConsultantPre-contract: 1. Request for proposalFIDIC White Book 2017 WordAED 149
Team organisation chart and CV setEmployer and Design ConsultantDesign Consultant EmployerPre-contract: 2. Proposal and awardUAE practice WordAED 79
Site data and survey requirements scheduleEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 3. Agreement and startUAE practice ExcelAED 79
Design basis reportEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 4. Concept design, 5. Schematic designUAE practice WordAED 149
Concept design reportEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 4. Concept designFIDIC White Book 2017 PowerPoint and WordAED 149
Area schedule and parking calculationEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvalsUAE practice ExcelAED 79
Schematic design reportEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 5. Schematic designFIDIC White Book 2017 WordAED 149
Value engineering workshop report and logEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 5. Schematic design, 6. Detailed design and approvalsUAE practice Word and ExcelAED 99
Fire and life safety strategy reportEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 5. Schematic design, 6. Detailed design and approvalsUAE practice WordAED 149
Green building compliance tracker (Estidama and Al Sa’fat)Employer and Design ConsultantDesign Consultant EmployerPost-contract: 5. Schematic design, 6. Detailed design and approvalsUAE practice ExcelAED 99
Design review checklist by disciplineEmployer and Design ConsultantDesign Consultant Design ConsultantPost-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvalsUAE practice ExcelAED 79
Detailed design reportEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 6. Detailed design and approvalsFIDIC White Book 2017 WordAED 149
Drawing list and drawing registerEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 6. Detailed design and approvals, 7. Tender packageUAE practice ExcelAED 59
Specification template (three-part sections)Employer and Design ConsultantDesign Consultant EmployerPost-contract: 7. Tender packageCSI MasterFormat WordAED 199
Bills of quantities template to NRM 2Employer and Design ConsultantDesign Consultant EmployerPost-contract: 7. Tender packageRICS NRM 2 ExcelAED 249
Bills of quantities template to POMIEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 7. Tender packageRICS POMI ExcelAED 249
Pre-tender estimateEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 7. Tender packageRICS NRM 1 ExcelAED 149
Tender documents template set and package transmittalEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 7. Tender packageFIDIC 1999 Red Book WordAED 299
Design change impact assessment (fee and programme)Employer and Design ConsultantDesign Consultant EmployerPost-contract: 8. Fees and changesFIDIC White Book 2017 Word and ExcelAED 79
Tender analysis and recommendation reportEmployer and Design ConsultantDesign Consultant EmployerPost-contract: 9. Tender support and close-outFIDIC 1999 Red Book Word and ExcelAED 149
Scope of supervision servicesEmployer and Supervision ConsultantEmployer Supervision ConsultantPre-contract: 1. Request for proposalFIDIC White Book 2017 WordAED 149
Supervision methodology statementEmployer and Supervision ConsultantSupervision Consultant EmployerPre-contract: 2. Proposal and awardFIDIC White Book 2017 WordAED 149
Supervision manpower deployment scheduleEmployer and Supervision ConsultantSupervision Consultant EmployerPre-contract: 2. Proposal and awardFIDIC White Book 2017 ExcelAED 99
Site team mobilisation and key staff approval requestEmployer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 3. Agreement and mobilisationFIDIC White Book 2017 WordAED 59
Supervision plan and procedures manualEmployer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 3. Agreement and mobilisationFIDIC White Book 2017 WordAED 199
Engineering review logEmployer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 4. Construction supervisionUAE practice ExcelAED 79
Engineer’s final account report and recommendationEmployer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 6. Handover and close-outFIDIC 1999 Red Book Word and ExcelAED 149
Supervision close-out report and records handoverEmployer and Supervision ConsultantSupervision Consultant EmployerPost-contract: 6. Handover and close-outFIDIC White Book 2017 WordAED 99
Engineer’s delegation of authority to assistantsEngineer and Main ContractorEngineer Main ContractorPost-contract: 3. Sign and startRB 3.2 WordAED 49
Bid or no-bid decision formEmployer and Main ContractorMain Contractor Main ContractorPre-contract: 1. TenderUAE practice ExcelAED 49
Tender register and enquiry trackerEmployer and Main ContractorMain Contractor Main ContractorPre-contract: 1. TenderUAE practice ExcelAED 59
Tender site visit reportEmployer and Main ContractorMain Contractor Main ContractorPre-contract: 1. TenderRB 4.10 WordAED 49
Estimate build-up and rate analysisEmployer and Main ContractorMain Contractor Main ContractorPre-contract: 1. TenderUAE practice ExcelAED 149
Tender qualifications and clarifications scheduleEmployer and Main ContractorMain Contractor EmployerPre-contract: 1. TenderFIDIC 1999 Red Book WordAED 59
Best and final offer submission letterEmployer and Main ContractorMain Contractor EmployerPre-contract: 2. Evaluation and awardUAE practice WordAED 39
Acknowledgement of award and pre-contract checklistEmployer and Main ContractorMain Contractor EmployerPre-contract: 2. Evaluation and awardFIDIC 1999 Red Book WordAED 49
Tender to project handover packEmployer and Main ContractorMain Contractor Main ContractorPost-contract: 3. Sign and startUAE practice WordAED 79
Prequalification submission and company profileEmployer and Design ConsultantDesign Consultant EmployerPre-contract: 1. Request for proposalUAE practice WordAED 99
Supply cost build-up and quotation pricing sheetMain Contractor and SupplierSupplier SupplierPre-contract: 1. TenderUAE practice ExcelAED 79
FM technical and commercial proposalEmployer and FM ProviderFM Provider EmployerPre-contract: 1. TenderUAE practice Word and ExcelAED 149
FM cost model and manpower build-upEmployer and FM ProviderFM Provider FM ProviderPre-contract: 1. TenderUAE practice ExcelAED 99
FM mobilisation plan and service start checklistEmployer and FM ProviderFM Provider EmployerPost-contract: 3. Sign and startUAE practice WordAED 99

No document matches

Change a filter or clear the search.