Engineer and Main Contractor
Subcontractor and supplier approval request
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 4.4
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 3. Sign and startRoute: Both routes
What this document does
- Requests consent to a proposed subcontractor or supplier with its prequalification and scope.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 4.4.
- Goes with: Engineer’s consent to subcontractor or supplier
What you get
- Fillable form
- Checklist of attachments
- One-page guide on when and how to use it
- File: Word
- Language: English
- Brand-ready: your logo and company details go in when you download