Engineer and Main Contractor
Site observation report
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes
What this document does
- Records observations on quality or safety that do not yet warrant a non-conformance report.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
- Step 5 of 6 in the Inspection and quality process.
What you get
- Fillable form
- One-page guide on when and how to use it
- File: Word
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Where it sits in the processes
Inspection and quality, step 5 of 6View all
BeforeNon-conformance report and log
This documentSite observation report
AfterMaterial inspection request on delivery