The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Notice to correct, notices of termination and suspension, and replies to the contractor’s suspension and termination notices, with the procedure each requires.
  • Sent by the Employer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 15.

What you get

Also used between