Employer and Design Consultant

Fire and life safety strategy report

Design ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 5. Schematic design, 6. Detailed design and approvalsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Occupancy, means of escape, compartmentation, fire systems and smoke control set out against the UAE Fire and Life Safety Code for the civil defence submission.
  • Sent by the Design Consultant to the Employer.
  • Written to UAE practice.

What you get

Also used between