Risk assessment and method statement (RAMS)

Main ContractorEngineer
Clause
UAE practice
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply and install, Install only, Design, supply and install, Labour only
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Task risk assessment with control measures linked to the method statement, for high-risk activities.
  • Sent by the Main Contractor to the Engineer.
  • Written to UAE practice.