Engineer and Main Contractor
O&M manual structure and as-built index
Main ContractorEngineer
Clause
UAE practice
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Scope: Supply and install, Design, supply and install, Supply only, Services and supervision
What this document does
- Section structure, system data sheets, maintenance schedules and the as-built drawing index reviewers expect.
- Sent by the Main Contractor to the Engineer.
- Written to UAE practice.
What you get
- Editable Word template
- Checklist of attachments
- One-page guide on when and how to use it
- File: Word
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project