Main Contractor and Subcontractor
Subcontract agreement, design, supply and installation
Main ContractorSubcontractor
Clause
FIDIC Conditions of Subcontract 2011
Time limit
Set by the agreement
Format
WordLanguage: English and Arabic
Stage
Post-contract: 3. Sign and startRoute: Both routes. Scope: Design, supply and install
What this document does
- Specialist subcontract with design responsibility, shop drawing obligations, performance warranties and professional indemnity.
- Sent by the Main Contractor to the Subcontractor.
- Written to FIDIC Conditions of Subcontract 2011.
What you get
- Editable Word template
- English and Arabic text side by side
- Schedules and appendices
- Clause-by-clause guide
- File: Word
- Language: English and Arabic
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project