Engineer and Main Contractor

Notice to correct

EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 15.1
Time limit
Set by the agreement
Format
WordLanguage: English and Arabic
Stage
Post-contract: 4. Build and monitorRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Requires the contractor to make good a failure within a specified reasonable time.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 15.1.