Employer and Design Consultant

Green building compliance tracker (Estidama and Al Sa’fat)

Design ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 5. Schematic design, 6. Detailed design and approvalsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Every mandatory and optional credit with the responsible discipline, the evidence needed at design and at construction, and the submission status.
  • Sent by the Design Consultant to the Employer.
  • Written to UAE practice.