Engineer and Main Contractor
Engineer’s consent to subcontractor or supplier
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 4.4
Time limit
Set by the agreement
Format
WordLanguage: English and Arabic
Stage
Post-contract: 3. Sign and startRoute: Both routes
What this document does
- Records the consent and the conditions attached to it.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 4.4.
- Goes with: Subcontractor and supplier approval request
What you get
- Editable Word template
- English and Arabic text side by side
- File: Word
- Language: English and Arabic
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project