Employer and Design Consultant

Design change request

EmployerDesign Consultant
Clause
FIDIC White Book 2017
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 8. Fees and changesRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • The Employer’s request to change the brief or design after a stage approval, with cost and time to be assessed.
  • Sent by the Employer to the Design Consultant.
  • Written to FIDIC White Book 2017.
  • Goes with: Additional services proposal (fee and time)

What you get