Main Contractor and Supplier

Factory and site acceptance test protocol

SupplierMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
Word and ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply only, Supply and install, Design, supply and install, Services and supervision

What this document does

  • Test schedule, acceptance criteria, witness attendance and result sheets for equipment before shipping and after installation.
  • Sent by the Supplier to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.4.
  • Step 9 of 14 in the Specialist equipment procurement process.

What you get

Where it sits in the processes

Specialist equipment procurement, step 9 of 14View all
BeforeExport and import licence checklist
This documentFactory and site acceptance test protocol
AfterShipping documents checklist

Also used between