Engineer and Main Contractor
Employer’s claim notice
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 2.5
Time limit
As soon as practicable after awareness
Format
WordLanguage: English and Arabic
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Notifies a claim for payment or an extension of the defects period, with particulars.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 2.5.
- Time limit: As soon as practicable after awareness.
What you get
- Editable Word template
- English and Arabic text side by side
- One-page guide on when and how to use it
- File: Word
- Language: English and Arabic
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project