Engineer and Main Contractor
Early warning notice
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 8.3
Time limit
Promptly, when a probable future event may delay or disrupt the works
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes
What this document does
- Gives advance notice of a probable event affecting time, cost or quality so it can be managed together.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.3.
- Time limit: Promptly, when a probable future event may delay or disrupt the works.
- Step 1 of 10 in the Delay and extension of time process.