Engineer and Main Contractor

Handover documents index

Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 4.1
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • As-builts, O&M manuals, warranties, spares, test certificates, training records and authority certificates with status.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 4.1.

What you get

Also used between