Commencement notice
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.1
Time limit
Not less than 7 days’ notice of the Commencement Date
Format
WordLanguage: English and Arabic
Stage
Post-contract: 3. Sign and startRoute: Both routes
What this document does
- The Engineer’s notice fixing the date from which the Time for Completion runs.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.1.
- Time limit: Not less than 7 days’ notice of the Commencement Date.
What you get
- Editable Word template
- English and Arabic text side by side
- File: Word
- Language: English and Arabic
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project