Engineer and Main Contractor
Request for information form and register
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 1.9
Time limit
Response period set in the communication protocol, commonly 7 to 14 days
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes
What this document does
- Raises a question on drawings or specifications in a standard form and tracks every answer and its response time.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 1.9.
- Time limit: Response period set in the communication protocol, commonly 7 to 14 days.
What you get
- Fillable form
- Log with status and ageing
- One-page guide on when and how to use it
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project