Engineer and Main Contractor
Testing and commissioning method statement and report
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 9.1
Time limit
Set by the agreement
Format
Word and ExcelLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes. Scope: Supply and install, Install only, Design, supply and install, Services and supervision
What this document does
- Pre-commissioning checks, test procedures, witness points and result sheets by system.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 9.1.
- Step 3 of 14 in the Handover, defects and close-out process.
What you get
- Editable Word template
- Excel schedules and summary sheet
- Checklist of attachments
- One-page guide on when and how to use it
- File: Word and Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Where it sits in the processes
Handover, defects and close-out, step 3 of 14View all
BeforeHandover strategy and documentation plan
This documentTesting and commissioning method statement and report
AfterCivil Defence inspection and completion certificate checklist