Engineer and Main Contractor
Fully detailed extension of time and prolongation claim
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 20.1
Time limit
Within 42 days of awareness of the event
Format
Word and ExcelLanguage: English
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Narrative, cause and effect, delay analysis table, prolongation cost build-up and supporting documents list.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 20.1.
- Time limit: Within 42 days of awareness of the event.
- Step 6 of 10 in the Delay and extension of time process.
What you get
- Editable Word template
- Excel schedules and summary sheet
- Worked example
- Checklist of attachments
- File: Word and Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Where it sits in the processes
Delay and extension of time, step 6 of 10View all
BeforeContemporary records pack and delay event log
This documentFully detailed extension of time and prolongation claim
AfterEngineer’s determination