Engineer and Main Contractor

Fully detailed extension of time and prolongation claim

Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 20.1
Time limit
Within 42 days of awareness of the event
Format
Word and ExcelLanguage: English
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Narrative, cause and effect, delay analysis table, prolongation cost build-up and supporting documents list.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 20.1.
  • Time limit: Within 42 days of awareness of the event.
  • Step 6 of 10 in the Delay and extension of time process.

What you get

Where it sits in the processes

Delay and extension of time, step 6 of 10View all
BeforeContemporary records pack and delay event log
This documentFully detailed extension of time and prolongation claim
AfterEngineer’s determination