Engineer and Main Contractor
Material inspection request on delivery
Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply only, Supply and install, Design, supply and install
What this document does
- Offers delivered materials for inspection against the approved submittal before they are used.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
- Step 6 of 6 in the Inspection and quality process.
What you get
- Fillable form
- Log with status and ageing
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Where it sits in the processes
Inspection and quality, step 6 of 6View all