Engineer and Main Contractor

Defect notification and log

EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 11.1
Time limit
Before expiry of the defects notification period
Format
Word and ExcelLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Notifies each defect with location, date and response required, and logs it to close-out.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 11.1.
  • Time limit: Before expiry of the defects notification period.
  • Step 11 of 14 in the Handover, defects and close-out process.

What you get

Where it sits in the processes

Handover, defects and close-out, step 11 of 14View all

Also used between