Engineer and Main Contractor

Inspection request and log

Main ContractorEngineer
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Notice before covering up work, commonly 24 hours
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply and install, Install only, Design, supply and install, Labour only
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Books an inspection of work before it is covered and records pass, fail and re-inspection.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
  • Time limit: Notice before covering up work, commonly 24 hours.
  • Step 1 of 6 in the Inspection and quality process.

What you get

Where it sits in the processes

Inspection and quality, step 1 of 6View all
Start of the process
This documentInspection request and log
AfterInspection request and log

Also used between