Engineer and Main Contractor
Notice extending the defects notification period
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 11.3
Time limit
Extension limited to two years in total
Format
WordLanguage: English and Arabic
Stage
Post-contract: 7. Handover and closeRoute: Both routes
What this document does
- Extends the period for works or sections that could not be used because of a defect.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 11.3.
- Time limit: Extension limited to two years in total.
What you get
- Editable Word template
- English and Arabic text side by side
- File: Word
- Language: English and Arabic
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project