Employer and Design Consultant

Design review checklist by discipline

Design ConsultantDesign Consultantinternal
Clause
UAE practice
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvalsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Checks before each submission: code compliance, coordination between disciplines, authority requirements and drawing standards, signed by the reviewer.
  • Kept by the Design Consultant as its own record.
  • Written to UAE practice.

What you get