Contract
Design ConsultantEmployer
Design services appointment on the FIDIC White Book basis. Before award: scope, proposals and selection. After award: concept, schematic and detailed design, authority approvals, the tender package and tender support.
Viewing as
Design appointment stages
Pre-contract
Post-contract
Pre-contractBefore award
1Request for proposal
6 documents. Scope of design services, prequalification and the request for proposal
Design Consultant issues
AED 99
Employer issues
AED 99
AED 39
AED 149
AED 199
AED 149
Stage pack: Design Consultant to Employer: Request for proposal
6 documents in this pack. 35% less than one by one.
2Proposal and award
9 documents. Technical and fee proposals, team, evaluation, negotiation and award
Design Consultant issues
AED 149
AED 99
AED 79
Employer issues
AED 49
AED 79
AED 39
Inside the Employer
Stage pack: Design Consultant to Employer: Proposal and award
9 documents in this pack. 35% less than one by one.
Post-contractAfter award
3Agreement and start
9 documents. Agreement, insurance, kick-off, deliverables programme and site data
Design Consultant issues
AED 49
AED 99
AED 199
AED 59
AED 79
Employer issues
AED 449
AED 39
AED 39
AED 79
Stage pack: Design Consultant to Employer: Agreement and start
9 documents in this pack. 35% less than one by one.
4Concept design
11 documents. Options, massing, design basis, area schedule and the first cost estimate
Design Consultant issues
AED 59
AED 149
AED 99
AED 39
AED 149
AED 149
AED 79
Employer issues
AED 79
AED 39
AED 39
Inside the Design Consultant
Stage pack: Design Consultant to Employer: Concept design
11 documents in this pack. 35% less than one by one.
5Schematic design
16 documents. The chosen option developed by every discipline, with the cost plan and design risks
Design Consultant issues
AED 59
AED 79
AED 99
AED 149
AED 99
AED 39
AED 149
AED 79
AED 149
AED 99
AED 149
AED 99
Employer issues
AED 79
AED 39
AED 39
Inside the Design Consultant
Stage pack: Design Consultant to Employer: Schematic design
16 documents in this pack. 35% less than one by one.
6Detailed design and approvals
18 documents. Coordinated detailed design, authority NOCs and the building permit
Design Consultant issues
AED 59
AED 79
AED 99
AED 79
AED 79
AED 149
AED 99
AED 39
AED 79
AED 99
AED 149
AED 99
AED 149
AED 59
Employer issues
AED 79
AED 39
AED 39
Inside the Design Consultant
Stage pack: Design Consultant to Employer: Detailed design and approvals
18 documents in this pack. 35% less than one by one.
7Tender package
11 documents. Drawing list, specification, bills of quantities and the tender documents
Design Consultant issues
AED 99
AED 39
AED 59
AED 199
AED 249
AED 249
AED 149
AED 299
Employer issues
AED 79
AED 39
AED 39
Stage pack: Design Consultant to Employer: Tender package
11 documents in this pack. 35% less than one by one.
8Fees and changes
7 documents. Fee invoices and certificates, design changes and additional services
Design Consultant issues
AED 99
AED 59
AED 79
Employer issues
AED 49
AED 99
AED 59
Inside the Employer
AED 79
Stage pack: Design Consultant to Employer: Fees and changes
7 documents in this pack. 35% less than one by one.
9Tender support and close-out
6 documents. Tender queries, tender analysis, issue for construction and close-out
Design Consultant issues
AED 49
AED 59
AED 99
AED 39
AED 149
Employer issues
No documents at this stage of this link.
Inside the Employer
Stage pack: Design Consultant to Employer: Tender support and close-out
6 documents in this pack. 35% less than one by one.