Contract
Design ConsultantSubconsultant

Sub-consultancy agreement for a specialist design discipline, back to back with the design appointment.

Viewing as
Design appointment stages
Pre-contract
Post-contract
Pre-contractBefore award

1Request for proposal

1 documents. Scope of design services, prequalification and the request for proposal

Subconsultant issues

No documents at this stage of this link.

2Proposal and award

2 documents. Technical and fee proposals, team, evaluation, negotiation and award

Design Consultant issues

No documents at this stage of this link.

Subconsultant issues

Post-contractAfter award

3Agreement and start

4 documents. Agreement, insurance, kick-off, deliverables programme and site data

Stage pack: Design Consultant to Subconsultant: Agreement and start

4 documents in this pack. 34% less than one by one.

AED 486AED 319

4Concept design

4 documents. Options, massing, design basis, area schedule and the first cost estimate

Design Consultant issues

Subconsultant issues

Stage pack: Design Consultant to Subconsultant: Concept design

4 documents in this pack. 35% less than one by one.

AED 396AED 259

5Schematic design

6 documents. The chosen option developed by every discipline, with the cost plan and design risks

Design Consultant issues

Stage pack: Design Consultant to Subconsultant: Schematic design

6 documents in this pack. 35% less than one by one.

AED 644AED 419

6Detailed design and approvals

6 documents. Coordinated detailed design, authority NOCs and the building permit

Stage pack: Design Consultant to Subconsultant: Detailed design and approvals

6 documents in this pack. 35% less than one by one.

AED 554AED 359

7Tender package

2 documents. Drawing list, specification, bills of quantities and the tender documents

Design Consultant issues

No documents at this stage of this link.

8Fees and changes

4 documents. Fee invoices and certificates, design changes and additional services

Subconsultant issues

Stage pack: Design Consultant to Subconsultant: Fees and changes

4 documents in this pack. 34% less than one by one.

AED 256AED 169