Handover, defects and close-out
From the handover strategy to the taking-over certificate, the defects period and the performance certificate.
Show steps for
14 steps in this process
2Handover strategy and documentation plan Main Contractor Engineer
RB 4.1 Commonly required six months before completion
AED 99
5Request for taking-over certificate Main Contractor Engineer
RB 10.1 Not earlier than 14 days before the works are expected to be complete; the Engineer responds within 28 days
AED 49
11Defect notification and log Engineer Main Contractor
RB 11.1 Before expiry of the defects notification period
AED 59
13Performance certificate Engineer Main Contractor
RB 11.9 Within 28 days of the latest expiry of the defects notification periods
AED 59
14Final statement and discharge Main Contractor Engineer
RB 14.11 Draft final statement within 56 days of receiving the Performance Certificate
AED 149