From a change found on site to a signed variation order, and back down into the subcontract.
Show steps for
10 steps in this process
3Notice of variation and request for instruction Main Contractor Engineer
RB 13.1 Promptly after identifying the change; particular conditions often set 7 days
AED 49
5Variation proposal with cost and time breakdown Main Contractor Engineer
RB 13.3 As soon as practicable after the request; particular conditions often set 14 days
AED 99